www.mtsunset.ac.zw Portal
Core77 - Blog • Feb. 11, 2026, 2:45 p.m.

A Smart Production Hack for Welding a Pegged Grid

German company Schweisstisch24 sells this D28 Tool Trolley , which targets their industrial welding clients. The beefy trolley, designed to hold clamps, squares and tools, has a load capacity of 240kg (529 lbs).

Because the company knows a thing or two about welding, they've come up with a production trick to cut the manufacturing time of these trolleys. Before welding the tubular pegs to the steel plate, they first run those parts through a laser cutter: "This makes our production process significantly faster," they explain, "as nothing needs to be aligned before welding." No measuring, no squaring parts up, no clamping in place.

Smart.

Source: core77.com ↗

← Back


Related